I am an ex staff from Zublin Ag Singapore Brench T06(TDSS) tunnel project, Currently working at T215 Thomson East Cost line MRT project.The good thingsI would like to work new TDSS tunnel and well experience with (Shaft/ Addition/ TBM) Extensive experience for the past 14 years in Mining and Tunnelling of both soft soil and hard
rock, actually involved in different methods in underground operations using various mining tools and machinery. These methods includes NATM,TBM, Cut & Cover, drill & blast, stopping excavations with other activities such as grouting, shotcreting, rock bolting, waterproofing, wall lining, segment building, compressed air work, timbering, core drilling, shaft and face nailing, piping, Ventilation, safety and other related works. Self-motivated professional and capable of working independently or as part of a team.
The challengesN/A