Proactive and positive approachThe good thingsExposure and new experience in consulting firm
The challenges• Ensure the builder carries out construction as per contract specification and approval. Attend to site refinement to design criteria in meeting local statutory requirements.
• Inspection M&E requirements on technical Co-ordination/ Design refinement/redesign on Engineering Smoke control system, pressure regime for laboratories to meet NSF 49 requirements working together with Lab consultant on high plume fans system serving Bio-Safety Cabinets and Fume hoods for Labs with Animal facilities, ACMV installation works, Fire protection system, Pre-RI T&C and commissioning of system.
• In conjunction with the JC’s and QP’s, assess Client/local statutory requirements and monitoring that these are met. Highlight to respective QP, through written reports, when non-compliance observed, ensuring that delivered product/works meets/comply with local statutory standard
• Work with operating staff to refine/establish procedures, standards, systems and design compliance procedures