Peck Brothers Construction Pte Ltd was setup in 1980 and incorporated in 1984 as a private limited company. In the early years, it was mainly involved in the laying of water and gas utility mains for the then Public Utilities Board.In 1991, th company ventured into foundation works and started out with big hydraulic hammer fitted on crawler piling rigs as well as jack-in pile and later diversified to the popular driven steel micropile. In 2004, the trend of using jack-in piles became increasing popular and the company started designing and manufactured a wide range of machine. To meet increasing market demards, the company introduced Bored micropile system and other services including Prebore H-pile, Prebore relieve-well, Silent sheetpile and Mini-bore to expand our range of capabilities.We are BCA registered contractor (Piling workhead CR08 - grade L5), and obtained ISO 9001, ISO 14001 & OHSAS 18001 certifications.
Peck Brothers Construction Pte Ltd was setup in 1980 and incorporated in 1984 as a private limited company. In the early years, it was mainly involved in the laying of water and gas utility mains for the then Public Utilities Board.In 1991, th company ventured into foundation works and started out with big hydraulic hammer fitted on crawler piling rigs as well as jack-in pile and later diversified to the popular driven steel micropile. In 2004, the trend of using jack-in piles became increasing popular and the company started designing and manufactured a wide range of machine. To meet increasing market demards, the company introduced Bored micropile system and other services including Prebore H-pile, Prebore relieve-well, Silent sheetpile and Mini-bore to expand our range of capabilities.We are BCA registered contractor (Piling workhead CR08 - grade L5), and obtained ISO 9001, ISO 14001 & OHSAS 18001 certifications.
Peck Brothers Construction Pte Ltd was setup in 1980 and incorporated in 1984 as a private limited company. In the early years, it was mainly involved in the laying of water and gas utility mains for the then Public Utilities Board.In 1991, th company ventured into foundation works and started out with big hydraulic hammer fitted on crawler piling rigs as well as jack-in pile and later diversified to the popular driven steel micropile. In 2004, the trend of using jack-in piles became increasing popular and the company started designing and manufactured a wide range of machine. To meet increasing market demards, the company introduced Bored micropile system and other services including Prebore H-pile, Prebore relieve-well, Silent sheetpile and Mini-bore to expand our range of capabilities.We are BCA registered contractor (Piling workhead CR08 - grade L5), and obtained ISO 9001, ISO 14001 & OHSAS 18001 certifications.